中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41947215      Online Users : 1047
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Community Statistics


    Item counts issued in 3 years: 104(9.38%)
    Items With Fulltext: 1109(100.00%)

    Download counts of the item
    Download times greater than 0: 1109(100.00%)
    Download times greater than 100: 994(89.63%)
    Total Bitstream Download Counts: 589317(1.45%)

    Last Update: 2024-11-27 12:28

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 301-325 of 1109. (45 Page(s) Totally)
    << < 8 9 10 11 12 13 14 15 16 17 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2016-08-31 非對稱產品需求下Retailer category management (RCM)與Category captainship (CC)的選擇決策;Retailer Category Management (RCM) Versus Category Captainship (CC) under Non-symmetric Product Demands 沈國基
    2016-08-31 重疊式批次平均法之信賴區間估計程序;On Developing Overlapping Batch Means Confidence Interval Procedures 葉英傑
    2016-08-31 配銷商型越庫之各類作業管理與決策問題的探討;A Study on the Various Operations Management and Decision Problems in Distributor Cross Docking 何應欽
    2016-08-31 發展永續供應鏈協調與合作之決策模型;Developing Decision Models for Sustainable Supply Chain Coordination and Cooperation 陳振明
    2016-08-29 以數學規劃求解最佳之間接材料選擇與人力配置;Material Supply Model of Automobile Assembly Line 張文權; CHANG,WEN-CHUAN
    2016-07-27 考量平行機台彈性以及惡化維護求極小化總完工時間之排程問題;Parallel machine scheduling with flexible and deteriorating maintenance activities for minimizing the total completion time 王凱弘; Wang,Kai-Hung
    2016-07-26 以分枝界限法求解雙機台間不具有儲存空間下 極小化總延遲時間之流程式生產排程問題;A Branch and Bound Algorithm for Total Tardiness Minimization in a Two-machine Flow Shop with Blocking 阮舒宜; Ruan,Shu-Yi
    2016-07-26 應用品質機能展開及設計結構矩陣設計建築物能源管理系統;Applying QFD and DSM for the Design of Building Energy Management Systems 陳耕綮; Chen,Geng-Chi
    2016-07-26 類似Kiva系統之Kiva機器人分配於揀貨工作站作業以及Pod之暫存位置決定的相關問題探討 俞舒寧; Yu,Su-Ning
    2016-07-26 類似Kiva系統之Pod分配於揀貨工作站的相關問題探討 何寬鴻; Kuan-Hong-Ho
    2016-07-26 類似Kiva系統之Pod分配於揀貨工作站與品項分配至訂單的相關問題探討 翁佳蓮; Weng-Chia-Lien
    2016-07-26 類似Kiva系統之訂單分配於揀貨工作站的相關問題探討 黃獎緯; Huang,Jiang-Wei
    2016-07-25 考慮產品水足跡之供應商選擇問題;Supplier Selection with Consideration of Product Water Footprint 呂柏勳; Lu,Po-Hsun
    2016-07-25 考慮碳排放之混合機車車隊途程規劃;Solving the Heterogeneous Motorcycle Fleet Routing Problem with Carbon Dioxide Emissions 李育穎; Li,Yu-Ying
    2016-07-25 考慮碳權之供應商選擇問題;Selection of Resource Supplier Considering Carbon Trade 蘇世昕; SU,SHI-XIN
    2016-07-25 研究廢輪胎回收處理方式之決策分析;Decision Analysis for Treatment of Waste tires Recycling 鍾宏維; Chung,Hung-Wei
    2016-07-21 以資料包絡分析法考量生態效益之供應商選擇;Consider Eco-efficiency for Supplier Selection Using Data Envelopment Analysis 林書瑋; Lin,Shu-Wei
    2016-07-21 政府涉入與回收成本結構對封閉供應鏈績效之影響;The Effects of Government Intervention and Collection Cost Structure on the Performance of Closed-Loop Supply Chains 林翊民; LIN,YI-MIN
    2016-07-21 電動機車電池交換之站址問題-以Gogoro為例;Arrangement of Battery Exchange Station for Electric Scooters – A Case Study of Gogoro 翁綱鴻; Weng,Gang-Hung
    2016-07-21 應用品質機能展開及設計結構矩陣設計智慧工廠;Applying Quality Function Deployment and Design Structure Matrix to design smart factory 梁乃哲; Liang,Nei-Zhe
    2016-07-20 HHT轉換法在採購價格不穩態下之應用;Application of Hilbert-Huang Transform Under a Non-stationary Purchasing Price 劉柏君; Liu,Po-Chun
    2016-07-20 探討未知風險態度下以買回合約制定合約組合;Portfolio of Contracts under the Buyback Contract for Unknown Risk Attitude 黃冠淳; Huang,Guan-Chun
    2016-07-20 銅金屬價格波動下的採購策略;Purchasing policy under the copper price fluctuations 溫景翔; WEN,CHING-HSIANG
    2016-07-20 機台可用區間及合適度限制求最小化總完工時間之平行機台排程問題;Identical Parallel Machine Scheduling with Machine Availability and Eligibility Constraints to Minimize Total Completion Time 陳昱全; Chen,Yu-Cyuan
    2016-07-19 應用物件導向設計結構矩陣設計工業4.0環境中的即時監控系統;Applying Object-Oriented Design Structure Matrix to Design the Real-time Monitoring System of Industry 4.0 蔡明叡; Tsai,Ming-Jui

    Showing items 301-325 of 1109. (45 Page(s) Totally)
    << < 8 9 10 11 12 13 14 15 16 17 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明