English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41942474      線上人數 : 1011
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/76590


    題名: 航空發動機維修廠備料流程改善之研究
    作者: 鄒相強;Chou, Hsiang-Chiang
    貢獻者: 工業管理研究所
    關鍵詞: 航空發動機;備料流程;流程改善;Aviation Engine;Marshaling process improvement
    日期: 2018-08-22
    上傳時間: 2018-08-31 11:29:03 (UTC+8)
    出版者: 國立中央大學
    摘要: 現代發動機維修市場競爭激烈,航空公司對發動機維修交期之長短是考慮委託修理的重要因素。A公司發動機維修廠為本文之研究標的,個案維修廠欲提升競爭力,設定縮短發動機修理天數及降低工時的目標,本研究試從發動機維修廠的角度研究如何以流程改善提升效率之方式,縮短發動機進廠修理時間,降低工時,增進維修廠的競爭力,以達到與客戶雙贏的目的。
    經研究分析,個案工廠在發動機修理流程中,造成出廠時間延誤最大的問題在於備料流程,故本研究主要針對備料流程作分析改善,利用柏拉圖、腦力激盪、魚骨圖、專家訪談等手法找出組織及流程之浪費,對於組織及流程加以改善與驗證並持續改善,對於改善行動可能附帶的風險亦加以辨識與評估,並持續監控其風險及成效。
    個案工廠透過組織改組、建立配料系統等手段改善備料流程減少浪費,經實際驗證,達成縮短發動機修理天數及節省備料工時的目標。
    ;The modern engine maintenance market is highly competitive, reducing the turnaround time of in-house repairs of the aircraft engine is an important factor for competitive MRO (Maintenance、Repair and Operations). The engine shop of A company is the subject of this paper,the engine shop wants to improve its competitiveness, set the goals of shortening the turnaround time of engine repair and reducing the working hours.
    This study tries to improve the efficiency of the process from the perspective of the engine repair shop and achieving a win-win situation with customers. According to the research and analysis, the engine parts preparation process is the major problem result in engine delivery delay; therefore, this study mainly analyzes the engine parts preparation process.
    This research using tools of Plato, brainstorming, fishbone diagram, expert interviews to identify waste of production processes, then improved and validated improvement, also identify and assess the risks associated with improving actions, and continuously monitor their risks and outcomes.
    The engine shop improved the engine parts preparation process to reduce waste by reorganization and establishing an engine parts marshaling system. After actual verification, the goals of shortening the number of engine repair days and saving the work-hours were achieved.
    顯示於類別:[工業管理研究所 ] 博碩士論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML321檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明