English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41943047      線上人數 : 1263
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/76563


    題名: TFT-LCD廠之自動化搬運系統的多屬性派送控制方法
    作者: 張軒銘;Chang, Hsuan-Ming
    貢獻者: 工業管理研究所
    關鍵詞: TFT-LCD;AMHS;Intra-Bay搬運;Inter-Bay搬運;多屬性派送;系統模擬;TFT-LCD;AMHS;Intra-Bay;Inter-Bay;Multi-attribute decision making;System simulation
    日期: 2018-07-25
    上傳時間: 2018-08-31 11:27:43 (UTC+8)
    出版者: 國立中央大學
    摘要: TFT-LCD面板產業為近年來台灣最快速發展的產業之一,在TFT-LCD 系統中投資興建更大之玻璃基板尺寸的面板廠,一直以來都是廠商擴大產能規模及提高產品價格競爭力的主要方式,由於隨著面板廠生產的玻璃基板面積越大,對所能切割的片數越多,不僅可以增加面板產量,亦能降低面板的單位生產成本,因此要面臨尺寸越大的基板搬運需求,其搬運的效率更顯得其重要性。
    現今TFT-LCD 面板廠都已導入電腦整合製造系統來整合全自動化的生產環境,而 AMHS為其中核心的一環,並配合製造執行系統在生產過程中處理玻璃基板的搬運與儲存作業,而組成AMHS的自動化物料搬運系統主要設備包括AGV、RGV和根據林坤濱(2008)所提出的內嵌式自動倉儲(In-Line Stocker)的Stacker Crane,故要如何依照生產流程及物料搬運,做出最有效率的搬運流動規劃,對未來的生產效率有其重大的影響。
    本研究針對TFT-LCD 系統中Array製程內的三個決策問題做探討,分別是Stacker Crane之Cassette選取問題、In-Line Stocker之出口點選取問題與RGV之Cassette選取問題,並針對三個研究問題分別提出三個多屬性派送法則。利用仿真模擬軟體Arena建構類似TFT-LCD廠的環境,期望從三個研究問題的多屬性派送法則中將產生之結果再與其他研究法則進行比較,找出最合適的派送問題決策,進而提昇整個系統派送控制以達到最佳作業效率。
    ;In recent years, TFT-LCD industry is one of the fastest growing industries in Taiwan. In order to produce a larger size panel has always been the expansion of production capacity and the improvement of product price competitiveness. Because the larger panel produced by the panel factory, the more the number of sheets that can be cut. So the efficiency of its handling is even more important.
    TFT-LCD panel factories have introduced computer integrated manufacturing systems to integrate automated production environments, and AMHS is an improtant part of them. The main equipment of the automated material handling system contained AGV, RGV and the In-line Stocker.
    In this study, we focus on three decision-making problems in the Array process of TFT-LCD system. Which are Stacker Crane′s Cassette selection problem, In-Line Stocker′s exit point selection problem and RGV′s Cassette selection problem. Three multi-attribute dispatching rules are proposed separately. Using the simulation software to construct an environment of the TFT-LCD factory, and we expected to compare the results of the multi-attribute dispatching rules of the three research questions with other research rules.
    顯示於類別:[工業管理研究所 ] 博碩士論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML227檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明