中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/60452
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 80990/80990 (100%)
造访人次 : 41951880      在线人数 : 1365
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/60452


    题名: 利用分支界限法求具有機台可用時間限制與工作可分割特性的平行機台排程問題之最佳解;A Branch and Bound Algorithm for Parallel Machine Scheduling with Availability and Job Preemption Constraints
    作者: 鄭善尉;Cheng,Shan-wei
    贡献者: 工業管理研究所
    关键词: 排程;分支界限法;平行機台;可用時間限制;Scheduling;branch and bound algorithm;parallel machine;machine availability
    日期: 2013-07-19
    上传时间: 2013-08-22 11:37:48 (UTC+8)
    出版者: 國立中央大學
    摘要: 在此研究中,我們考慮當極小化最大總作業之完工時間時,在具機器可用時間且工作具有可分割性限制下,n個可以分割的工作和m台平行機台的排程問題。每台機器只有某些時間區段可以被安排處理工作。所有的機台、工作與機台的可用時間區段,在一開始都是已知的。
    我們提出一個分支界限演算法去尋找這個問題的最佳解。首先,我們修改Liao & Sheen (2008)切割時間區間的方式,將時間區間以各機台獨立的方式去做切割。其次,我們提出啟發式演算法,利用以最短剩餘時間加工(SRPT)的法則得出的可行解,當作其上界限值。最後,我們提出分枝的方式與減少分枝不必要分枝的方法。
    實驗的分析顯示,分支界限法所產生的節點數比例非常小,顯示提出的淘汰法則強而有力。我們的演算法能用於七個工作和三台機器問題下而得到一個最佳解。
    In this paper, we consider the problem of scheduling n jobs on identical machines with machine availability and job preemption constraints when minimizing the total completion time. Each machine is not continuously available for processing at all time and job preemption is allowed. At the beginning, each job of processing time and the time of machine available is known.
    We propose a branch and bound algorithm to find out the optimal solution. First, we focus on our constraint, machine availability to modify the method used in Liao & Sheen (2008) to deal with it. Second, we propose our bounding scheme, branching scheme, and propositions used in branch and bound algorithm. In the end, we use these bounding scheme and dominance rules to eliminate unnecessary nodes of branch and bound algorithm.
    Computational analysis shows that the effectiveness of eliminating rules proposed is powerful and very low percentage of nodes is generated by the branch and bound algorithm. Our algorithm can get the optimal solution for the problem with up to 7 jobs and 3 machines.
    显示于类别:[工業管理研究所 ] 博碩士論文

    文件中的档案:

    档案 描述 大小格式浏览次数
    index.html0KbHTML744检视/开启


    在NCUIR中所有的数据项都受到原著作权保护.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明