中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/48689
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41956342      Online Users : 1267
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/48689


    Title: 考慮虛擬年齡與連續的利用率之最佳不完美維護策略;A continuous time model for optimal policy of imperfect maintenance system with consideration of virtual age and utilization
    Authors: 廖晉尉;Jin-wei Liao
    Contributors: 工業管理研究所
    Keywords: 維護;虛擬時間;使用率;連續時間馬克夫鏈;utilization;virtual age;maintenance;overhaul;continuous time Markov chain
    Date: 2011-07-08
    Issue Date: 2012-01-05 15:03:54 (UTC+8)
    Abstract: 在這篇論文,我們主要是建立一個不完美的維護模型,結合了一連續時間的使用率並建立在一個虛擬年齡的模型下所求出的最佳維護策略. 在此論文將楊(2011)的模型從間斷時間的使用率改成連續時間的 等候線模型。實際上,我們知道每一段區間的使用率會受到上一期未完成的組件數量,區間長度以及到達率跟服務率比例的影響。此虛擬時間函數以Liu et al.(1995) 的概念為基礎,此函數可以更容易去分析失敗率因為失敗率函數不會改變。此函數會受到使用率、維護程度而對失敗率產生變化。因此虛擬函數受到這些因子影響後,會使得函數時間曲線回復。所以我們要決定最佳的PM次數及維護的長度在一固定區間的維護模型下,並且探討不同參數的變化對模型產生的影響。 In this study, our purpose is to construct an imperfect maintenance model, which combines utilization with continuous time and based on virtual age function, for computing the minimized expect total cost to decide an optimal policy. We extend Yang (2010) for utilization to a continuous time Markov chain with queuing model. In practical, we know that utilization of every period will be decided by the service of the units are not completed in the end of last station, the length of the overhaul interval, and the proportion of arrival rate with service rate. Then, the concept of our virtual age function is based on Liu, Makis and Jardine (1995). This function can use to analyze failure time function more easy but it does not change. The utilization and degree of maintenance of the system are both affected by the failure intensity function with a virtual age function. Besides, the virtual age function will also be affected by two improvement factors that are general repair and PM action both restore the function curve to a certain degree. In this thesis, we will determine optimal PM times and general repair length over a finite planning horizon with a periodic replacement model, and show how it varies with parameters.
    Appears in Collections:[Graduate Institute of Industrial Management] Electronic Thesis & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML630View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明