English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41951465      線上人數 : 1079
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/31369


    題名: An event-driven approach with makespan/cost tradeoff analysis for project portfolio scheduling
    作者: Hsing-Pei Kao,Brian Wang,James Dong,Kuo-Cheng Ku
    貢獻者: 工業管理研究所
    關鍵詞: FLEXIBLE MANUFACTURING SYSTEMS;SIMULATED ANNEALING ALGORITHM;RESOURCE-ALLOCATION;PETRI NETS;PRODUCT DEVELOPMENT;DECOMPOSITION APPROACH;LIMITED RESOURCES;GENETIC ALGORITHM;BOUND PROCEDURE;MANAGEMENT
    日期: 2006
    上傳時間: 2010-07-06 17:44:05 (UTC+8)
    出版者: 中央大學
    摘要: Project Portfolio Management (PPM) has become increasingly important in managing multiple projects simultaneously. However, during execution, the project portfolio is associated with considerable uncertainty that leads to resource contention among project
    關聯: COMPUTERS IN INDUSTRY
    顯示於類別:[工業管理研究所 ] 期刊論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML381檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明