English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41953664      線上人數 : 956
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋

    子類別

    博碩士論文 [760/760]
    期刊論文 [77/77]
    考古題 [176/176]
    研究計畫 [96/96]

    社群統計


    近3年內發表的文件: 104(9.38%)
    含全文筆數: 1109(100.00%)

    文件下載次數統計
    下載大於0次: 1109(100.00%)
    下載大於100次: 998(89.99%)
    檔案下載總次數: 589906(1.45%)

    最後更新時間: 2024-11-27 17:36

    上傳排行

    資料載入中.....

    下載排行

    資料載入中.....

    RSS Feed RSS Feed
    跳至:
    或輸入年份:
    由新到舊排序 由最舊的開始

    顯示項目676-700 / 1109. (共45頁)
    << < 23 24 25 26 27 28 29 30 31 32 > >>
    每頁顯示[10|25|50]項目

    日期題名作者
    2008-06-13 應用品質機能展開與設計結構矩陣於產品平台發展與評估; Applying QFD and DSM for Product Platform Development and Evaluation 鄭傳儒; Chuan-Ju Cheng
    2008-06-12 協同設計中以流程導向為架構的風險管理; A Process-Oriented Framework of Risk Management in Collaborative Design 簡玠; Chieh Chien
    2008-05-01 97年工管所(甲)微積分試題 工業管理研究所
    2008-05-01 97年工管所(甲)管理學試題 工業管理研究所
    2008-05-01 97年工管所(甲)經濟學試題 工業管理研究所
    2008-05-01 97年工管所(甲)統計學試題 工業管理研究所
    2008-05-01 97年工管所(乙)統計學試題 工業管理研究所
    2008-05-01 97年工管所(乙)作業研究試題 工業管理研究所
    2008-05-01 97年工管所(乙)生產與作業管理試題 工業管理研究所
    2008-01-08 激勵策略下協同供應鏈決策之最佳化模式; Optimization Models for Coordinating Supply Chain Decisions under Incentive Policies 曹譽鐘; Yu-Chung Tsao
    2008-01-04 時間-成本權衡法於同步工程環境中之發展與應用; Development and Applications of a Time/Cost Trade-off Method in Concurrent Engineering Environment 王福川; Fu-Chuan Wang
    2008 A knowledge management system for series-parallel availability optimization and design Juang,Ying-Shen; Lin,Shui-Shun; Kao,Hsing-Pei
    2008 An empirical study on knowledge integration, technology innovation and experimental practice Hung,Hsu-Fang; Kao,Hsing-Pei; Chu,Yee-Yeen
    2008 An integrated information system for product design planning Hung,Hsu-Fang; Kao,Hsing-Pei; Juang,Ying-Shen
    2008 Dynamic pricing, promotion and replenishment policies for a deteriorating item under permissible delay in payments Tsao,Yu-Chung; Sheen,Gwo-Ji
    2008 Ontology-based knowledge management for joint venture projects Ku,Kuo-Cheng; Wensley,Anthony; Kao,Hsing-Pei
    2008 Optimal parallel machines scheduling with machine availability and eligibility constraints Sheen,Gwo-Ji; Liao,Lu-Wen; Lin,Cheng-Feng
    2008 Order-batching methods for an order-picking warehouse with two cross aisles Ho,Ying-Chin; Su,Teng-Sheng; Shi,Zhi-Bin
    2008 Parallel machine scheduling with machine availability and eligibility constraints Liao,Lu-Wen; Sheen,Gwo-Ji
    2008 Reply to &quot;Comment on 'Optimizing supply chain collaboration based on joint replenishment and channel coordination Chen,Jen-Ming; Chen,Tsung-Hui
    2008 Simultaneous determination of view selection and update policy with stochastic query and response time constraints Liu,Yu-Chin; Hsu,Ping-Yu; Sheen,Gwo-Ji; Ku,Steve; Chang,Kai-Wen
    2007-12-19 田口式實驗設計法於改善筆記型電腦中央處理器過熱問題研究 王宏嘉; Hung Chia
    2007-12-07 協同產品開發之最佳設計方案評估與選擇; Evaluating and selecting an optimum design alternative for collaborative product development 洪勖芳; Hsu-Fang Hung
    2007-07-10 迴流工作具最小與最大時間延滯限制之平行機台排程問題; Parallel Machine Scheduling with Minimal and Maximal Time Lags for Reentrant Job 詹珮芸; Pei-Yun Chan
    2007-07-10 考量機台維修與機器何適度限制之平行機台排程問題; Scheduling the Jobs and Maintenance Activity on Parallel Machines with Eligibility Constraints 洪崇賓; Chung-pin Hung

    顯示項目676-700 / 1109. (共45頁)
    << < 23 24 25 26 27 28 29 30 31 32 > >>
    每頁顯示[10|25|50]項目

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明