中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/11091
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41959568      Online Users : 1143
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/11091


    Title: 考慮多模式專案排程下資源撫平之研究;Resource Leveling in Multi-Mode Project Scheduling
    Authors: 林昭凱;Jhao-Kai Lin
    Contributors: 工業管理研究所
    Keywords: 專案排程;資源撫平;多模式資源限制專案排程問題;遺傳演算法;Resource leveling;Multi-Mode Resource Schedulin
    Date: 2004-06-24
    Issue Date: 2009-09-22 14:13:43 (UTC+8)
    Publisher: 國立中央大學圖書館
    Abstract: 資源撫平(Resource Leveling)問題自從資源限制專案排程(Resource Constrained Project Scheduling Problem,RCPSP)發展以來就一直倍受重視,有許多的相關研究在解決這方面的問題。可是現有的資源撫平問題,都著眼在單一模式資源限制專案排程(Single-mode Resource Constrained Project Scheduling Problem,SRCPSP)上,在現實事件的專案中,單一模式的專案非常少見。而另依方面,再現有的多模式資源限制專案排程問題中,亦未見到相關資源撫平的文獻出現,因此本篇論文希望能將資源撫平的問題拓展於多模式資源限制專案排程問題(Multi-mode Resource Constrained Project Scheduling Problem,MRCPSP)之上。 本研究以資源撫平為目標,利用遺傳演算法同時進行作業模式(Mode)的選擇以及排程的結果。此外,利用遺傳演算中適應函數(fitness function)的調整,使得此演算法可以依照管理者不同需求而去調整適應函數以達到預期中希望達到的目標。 The fluctuation of required resources causes problem cause problem in project scheduling. Thus research developed resource leveling techniques to minimize the deviation between the resource requirement and the desired resourced profile. However, the resource leveling problem, can not be considered with Multi-mode Resource-Constrained Problem (MRCPSP), that is an activity can be preformed in one or more combinations of durations and resource requirements. In this paper, we consider resource leveling in Multi-mode Project Scheduling. We describe a Genetic Algorithm for this problem. The proposed algorithm can effectibly provide the near-optimal solution for different situation and fit the goal that is project manager wanted.
    Appears in Collections:[Graduate Institute of Industrial Management] Electronic Thesis & Dissertation

    Files in This Item:

    File SizeFormat


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明