中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/11025
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41955698      Online Users : 976
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/11025


    Title: 發展一訂單履行流程中例外事件處理方法 -以 i-Hub 所支援延展式供應鏈為環境;An Exception Handling Method of Order Fulfillment Process in the i-Hub Supported Extended Supply Chain
    Authors: 姚泰郎;Tai-Lang Yao
    Contributors: 工業管理研究所
    Keywords: GTST-MLD;事件樹分析;延展式供應鏈;失效樹分析;訂單履行流程;ETA;OFP-Controller;Extended Supply Chain (ESC);FTA;Information Hub (i-Hub);Order Fulfillment Process (OFP);GTST-MLD
    Date: 2003-06-26
    Issue Date: 2009-09-22 14:12:20 (UTC+8)
    Publisher: 國立中央大學圖書館
    Abstract: 隨著電子交易市集的興起,供應鏈有著顯著的改變,從企業內部的整合到與上、下游廠商所組成跨公司的價值網絡稱之為延展式供應鏈。為使其能運行順利,在供應商、製造商,零售商、物流服務者與消費者之間透過資訊共享之協同合作演變成相當重要。其中,可預期的是每一個供應鏈成員把規劃功能委託、授權與i-Hub之協同合作模式在延展式供應鏈中已慢慢興起。 以供應鏈與電子市集的的種種特徵為基礎,在協同合作下,對於探究i-Hub的功能如何促使供應鏈之規劃、執行、控制與事件管理,尤其對訂單履行流程之協同整合模式是值得注意與探究的。針對此一問題,在本論文中,發展一訂單履行流程中例外事件處理方法,並以i-Hub所支援之延展式供應鏈為環境,為預防例外事件發生,進而採用可靠度工程之方法論,GTST-MLD、事件樹分析與失效樹分析建構一訂單履行流程之控制器。 With the emergence of Internet-based electronic marketplaces (EMs), the supply chain (SC) has significantly changed from internal integration to cross-company value network, which is called the extended supply chain (ESC). To make ESC work smoothly, the collaboration through information sharing among supplier, manufacturer, retailer, logistic service provider (LSP) and consumer becomes extremely important. It is foreseeable that the collaboration in the extended supply chain will be proceeded via Information-Hub (i-Hub) to which the planning function of each chain member is delegated. With the SC framework and the features of electronic marketplace as a background, it is significant to explore how the functionality of i-Hub can facilitate collaborative supply chain with respect to planning, execution, control and event management, especially regarding order fulfillment process. In this thesis, we develop an “Exception Handling Method” to address this problem. Further, the Order Fulfillment Process Controller (OFP-Controller) is constructed to prevent the occurrence of exception in i-Hub supported extended supply chain. Adopted from the field of Reliability Engineering and System Safety, Goal Tree-Success Tree and Master Logic Diagram (GTST-MLD), Event Tree Analysis (ETA) and Fault Tree Analysis (FTA) are used to construct the Controller.
    Appears in Collections:[Graduate Institute of Industrial Management] Electronic Thesis & Dissertation

    Files in This Item:

    File SizeFormat


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明