中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/10990
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41963412      Online Users : 912
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/10990


    Title: 專案範圍變動下應變成本之重新配置:系統動態學在專案風險管理的應用;System Dynamics in Project Risk Management: Reallocating the Contingency Cost under the Project Scope Change
    Authors: 尚靜宜;Ching-I Shang
    Contributors: 工業管理研究所
    Keywords: 應變成本;專案範圍;系統動態;Contingency cost;System dynamics;Project scope
    Date: 2002-07-01
    Issue Date: 2009-09-22 14:11:33 (UTC+8)
    Publisher: 國立中央大學圖書館
    Abstract: The fast changing environment and the complexity of projects has increased risk exposure. Traditional tools and technologies used in the process of risk management are not appropriate owning to its static analysis attribute. The project manager perceives the importance of taking prospective tools to face the challenge and keep the effort to control the project. This research proposes a project risk dynamics model to lead the project manager how to reallocate the contingency cost under the project scope change with a holistic view. By combining the process of risk management and system dynamics analysis in the project management, early signs of risk emergence, which would remain unperceived until problems would aggravate, can be identified in the project. Hence, the project manager can take better advantage offered by System Dynamics modeling, while enhancing the performance of the existing risk management process. Project scope change creates a series of effects and causes cost overruns that affect the schedule and lower performance in the long run. This research presents a risk dynamics framework that displays a trade-off process between cost and schedule and thereby attempts to revise the contingency cost and keep it under control. A pipeline work package is modeled and discussed. The fast changing environment and the complexity of projects has increased risk exposure. Traditional tools and technologies used in the process of risk management are not appropriate owning to its static analysis attribute. The project manager perceives the importance of taking prospective tools to face the challenge and keep the effort to control the project. This research proposes a project risk dynamics model to lead the project manager how to reallocate the contingency cost under the project scope change with a holistic view. By combining the process of risk management and system dynamics analysis in the project management, early signs of risk emergence, which would remain unperceived until problems would aggravate, can be identified in the project. Hence, the project manager can take better advantage offered by System Dynamics modeling, while enhancing the performance of the existing risk management process. Project scope change creates a series of effects and causes cost overruns that affect the schedule and lower performance in the long run. This research presents a risk dynamics framework that displays a trade-off process between cost and schedule and thereby attempts to revise the contingency cost and keep it under control. A pipeline work package is modeled and discussed.
    Appears in Collections:[Graduate Institute of Industrial Management] Electronic Thesis & Dissertation

    Files in This Item:

    File SizeFormat


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明